Monday, December 15, 2008

November 2008

Off Tu Mission Academy, is the name that has been chosen for the 'school'.
The interiors of the existing blocks have been painted.
Plans are still underway to start the school officially in 2009.
To fulfill the above, an administration block is a requirement.
Work has therefore begun on construction of the block, in preparation for opening in 2009.
We thank God immensely, who makes all things possible.




Johann inspecting the ongoing work...
...below are the newly painted blocks (interior)

WE WISH YOU HAPPY HOLIDAYS!!

Thursday, November 20, 2008

October 2008

In October, plastering of the interior walls of all blocks at the school was completed. We were also able to cement all floors. Landscaping of the outside is also still in progress.
We thank God who makes all this possible and for all of you for your continued support.




Interior of one of the blocks




















Exterior of the blocks and landscaping















One of the blocks after plastering and floor finishing


Monday, October 6, 2008

September 2008

We once again are celebrating victories at Off Tu Mission. At the school, we have been working on plastering the walls- starting with the interior.
There has also been some landscaping out side the blocks as a way of curbing erosion and tear.
We are again thankful for all your support in prayer and financially. Your labour is not in vain.

Below are some pictures showing the work at the school.

Men at work


















Interior of one of the blocks, one side is plastered










A block whose interior is fully plastered


























Landscaping out side the blocks

























Exterior of the blocks

Monday, September 15, 2008

August

As we reported in July, roofing was embarked on in August.
We are very grateful and convey our sincere thanks for all your efforts and prayers which have made this possible.
For every one that is standing with us in this,our prayer is that God bless you and Multiply you. Your Labour is not in vain.

Below are some Pictures showing the progress on Roofing.
























View from the Upper section of the blocks














Front view of first block




























Initial stage of roofing





















Thursday, August 7, 2008

Off tu Mission School






Last month we reported about the classroom blocks that were under construction. We thank God very much and we are glad to inform you that all the 4 classroom blocks are now ready for roofing.

The community neighboring the school now has access to safe living water through one of the first solar powered LWTS in Uganda. We thank God for his goodness.

The pictures show some of the children from the community getting clean drinking water.


We thank God who has successfully brought us to the completion of phase 1 of the school construction. As soon as the four blocks are roofed (which is going on now), then phase one is complete.

The second phase is to include three classrooms, and Administration space. We believe God is faithful, and will provide for this phase as well.


These are some of the pictures showing the four blocks at the school.


May God bless and increase you all for your efforts.


Thank you.

Saturday, July 5, 2008

school progress


during the month of June, two class room blocks were started upon, and are now at roofing level.

The foundation for two other blocks has already been laid.

the water system at the school has also been completed. the school premises are therefore fully equipped with safe runnng water.

plans are also under way to set up a tap, that will supply the neighbouring community with safe water.




the pictures show some of the progress on the school.













the block at roofing level.
























the toilet is also under construction, and will soon be completed.